Nanjing Ocean-Runpower Electric Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Fang Wilson
  • Company Name : Nanjing Ocean-Runpower Electric Co., Ltd.
  • Tel : 86-025-84717199
  • Fax : 86-025-84719773
  • Address : Jiangsu,Nanjing,Industrial Park, sanshan , Banqiao Street, Yuhuatai District Nanjing Jiangshu China
  • Country/Region : China
  • Zip : 210002

Aluminum alloy and galvanized steel full tension preformed conductor splice

Aluminum alloy and galvanized steel full tension preformed conductor splice
Product Detailed
Related Categories:Other Electrical Equipment
Aluminum alloy and galvanized steel full tension preformed conductor splice 1.Least loss 2.Anti-loosening 3.Well corrosion

Aluminum alloy and galvanized steel full tension preformed conductor splice 

Application&Structure

Full tension preformed conductor splice follow the break connection, damage repair and so on, can replace the widely used hydraulic connecting pipes, burst pressure connecting tubes connecting methods.

Full tension preformed conductor splice is made  from the inner section of tension continue, filling section, the outer section of three parts.

1)The inner rods Shall be used to follow steel core;

2)Filling rods shall be installed in the inner layer, guaranteeing installation of the same diameter and the diameter ACSR.

3)The outer line splicing  is designed to follow basic agreement Traverse only slightly increased to compensate for the length of stripped of the aluminum wire.

Characteristics

1.The grip strength of full tension preformed conductor splice  forces up to the rated breaking strength of strands, such as electrical conductivity than ACSR long.

2.Full tension preformed conductor splice can be restored ACSR Tension follow the breaking strength of 100% and 100% of the wire resistance.

Consideration

1.Whether or not the new and old wire, steel core and aluminum wire must be installed within the length of the article follow the surface thoroughly polished, bright and clean the surface after the coated surface quality immediately, and the conductive grease wire match, and then Start the installation.

2.When connecting the wire section of the mid-point and point alignment damaged during installation, the end lengh of full tension preformed conductor splice has been installed from end of  the preformed armour rods  or short preformed armour rods is not less than 150mm, only wire damage on the last point in the support points or damage point, we can continue with this article, and play follow the maintenance performance of the above article.

3.Full tension preformed conductor splice can only be used once.

Aluminum alloy and galvanized steel full tension preformed conductor splice



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.